| MOT/KTMB/TB/9/2015 | | DESIGN, MANUFACTURE,SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF RESTORATION OF COMMUNICATION SYSTEM (DIGITAL TRANSMISSION SYSTEM) AT RAILWAY STATION FROM CHEGAR PERAH TO KRAI | RAYYAN SOLUTION SDN BHD | RM 2,996,803.89 | 12 BULAN | | MOT/KTMB/TB/11/2015 | | DESIGN, MANUFACTURE, SUPPLY, DELIVERY, TESTING AND COMMISSIONING OF NEW MOTOR TROLLEY AND NEW ROAD RAIL VEHICLE | SYSTEM ENHANCEMENT RESOURCES | RM 62,003,000.00 | 24 BULAN | | MOT/KTMB/TB/12/2015 | | DESIGN, MANUFACTURE, SUPPLY, DELIVERY, TESTING AND COMMISSIONING OF NEW BOGIE BALLAST HOPPER WAGON (BBHW) AND BOGIE RAIL AWAGON (BRW) | TRACKWORK & SUPPLIES SDN BHD | RM 23,886,894.00 | 24 BULAN | | MOT/KTMB/TB/18/2015 | | TENDER DESIGN, CONSTRUCTION, COMPLETION, TESTING, COMMISSIONING AND MAINTENANCE OF NEW QUARTERS BUILDING STATIONS AND OTHER ASSOCIATED WORKS AT KTMB DABONG AND KEMUBU STATION KELANTAN | LAMBAIAN CITRA ENTERPRISE | RM 2,853,689.60 | 12 BULAN | | MOT/KTMB/TB/23/2015 | | DESIGN, MANUFACTURE, SUPPLY, DELIVERY, TESTING AND COMMISSIONING OF NEW ON-TRACK MACHINERIES | TWA (MALAYSIA ) SDN BHD | RM 339,934,971.00 | 24 BULAN | | MOT/KTMB/TB/27/2015 | | DESIGN, CONSTRUCTION, COMPLETION, TESTING, COMMISSIONING AND MAINTENANCE OF NEW STATION BUILDING AND OTHER ASSOCIATED WORKS AT KTMB MANEK URAI STATION, KELANTAN | RESDAR ENGINEERING SDN BHD | RM 6,084,294.00 | 18 BULAN | | MOT/KTMB/TB/26/2015 | MOT/KTMB/TB/3/2015 | UPGRADING AND MODIFICATION OF NILAI UKM STATIONS AND ASSOCIATED WORKS | LMS HIGH TECH SDN BHD | RM 9,381,000.00 | 18 BULAN | | MOT/KTMB/TB/1/2016 | | SUPPLY OF FLOATING SPARE PARTS FOR CLASS 83 EMU COMPONENT EXCHANGE PROGRAM - SUPPLY OF GEARBOX ASSEMBLY COMPLETE WITH AXLE | SGSS ENGINEERING (M) SDN BHD | RM 5,242,400.00 | 12 BULAN | | MOT/KTMB/TB/1/2016 | | SUPPLY OF FLOATING SPARE PARTS FOR CLASS 83 EMU COMPONENT EXCHANGE PROGRAM - SUPPLY OF CONNICAL RUBBER SPRINGS | PADU SEDIA SDN BHD | RM 2,268,880.00 | 12 BULAN | | MOT/KTMB/TB/3/2016 | | DESIGN, BUILD, CONSTRUCTION, COMPLETION, TESTING & COMMISSIONING OF ELECTRIFICATION MAINTENANCE DEPOT AT SLIM RIVER, KAMUNTING, TOKAI, TAMPIN AND UPGRADING SALAK SELATAN DEPOH | ZABIMA ENGINEERING AND CONSTRUCTION SDN BHD | RM 20,020,482.88 | 24 BULAN | | MOT/KTMB/TB/4/2016 | | SUPPLY OF FLOATING SPARE PARTS FOR CLASS 91 ETS COMPONENT EXCHANGE PROGRAM | PADU SEDIA SDN BHD | RM 1,410,000.00 | 12 BULAN | | MOT/KTMB/TB/4/2016 | | SUPPLY OF FLOATING SPARE PARTS FOR CLASS 91 ETS COMPONENT EXCHANGE PROGRAM- SUPPLY OF MKP TREAD BRAKE UNIT WITH PARKING | TLT POWER SDN BHD | RM 2,515,200.00 | 12 BULAN | | MOT/KTMB/TB/5/2016 | | RESTORATION, STRENGTHENING AND SUBSTRUCTURE PROTECTION FOR BRIDGES, TRACKWORKS AND ASSOCIATED WORKS DUE TO MAJOR FLOOD BETWEEN GUA MUSANG TO WAKAF BARU RAILWAY STATION, KELANTAN | SYARIKAT KAMASHARI SDN BHD | RM 9,118,310.80 | 15 BULAN | | MOT/KTMB/TB/6/2016 | | PROPOSED REHABILITATION, UPGRADING OF RAILWAY TRACK AND ASSOCIATED WORKS FROM KEMPAS BARUTO PASIR GUDANG RAILWAY STATION, YARDS AND JOHOR PORT LINE, JOHOR | AKS SEPAKAT SDN BHD | RM 81,090,000.00 | 24 BULAN | | MOT/KTMB/TB/7/2016 | | SUPPLY, INSTALL, TESTING AND COMMISSIONING OF TIMETABLE MANAGEMENT SYSTEM AND SIMULATION SOFTWARE FOR KERETAPI TANAH MELAYU BERHAD | TRIDIMAS SDN BHD | RM 7,700,000.00 | 12 BULAN | | MOT/KTMB/TB/8/2016 | | STUDY, DESIGN, SUPPLY, INSTALLATION , TESTING AND COMMISSIONING OF HARDWARE, SOFTWARE AND APPLICATIONS OF DISASTER RECOVERY CENTRE AND UPGRADING EXISTING DATA CENTRE FOR KERETAPI TANAH MELAYU BERHAD | TRIDIMAS SDN BHD | RM 9,690,000.00 | 15 BULAN | | MOT/MOT/TT/1/2015 | | REHABILITATION, UPGRADING OF TRACK AND ASSOCIATED WORKS BETWEEN GEMAS, NEGERI SEMBILAN AND MENTAKAB RAILWAY STATION - PAKEJ A | HIKMAT ASIA SDN BHD | RM 216,963,842.20 | 36 BULAN | | MOT/KTMB/TT/2/2015 | | REHABILITATION OF TRACK FORMATION, REPLACEMENT OF BALLAST AND ASSOCIATED WORKS BETWEEN JERANTUT, PAHANG TO GUA MUSANG RAILWAY STATION, KELANTAN (PACKAGE B) | FAJARBARU BUILDER SDN BHD | 259,700,000.00 | 36 BULAN | | MOT//TB/2/2016 | | PEROLEHAN PERKHIDMATAN PERUNDING BAGI KAJIAN KEMUNGKINAN PADANG TERBANG LAWAS BAHARU, SARAWAK | JURUTERA MINSAR CONSULT SDN BHD | RM 1,986,825.06 | 5 BULAN |
|